CIVIL ENGINEERING HIGHWAY ENGINEERING MCQ’s

The stopping sight distance is the

Correct! Wrong!

The stopping sight distance depends upon the

Correct! Wrong!

The opportunities to cross slow moving traffic at intervals is not provided in case of

Correct! Wrong!

The reason for providing curves on a highway is

Correct! Wrong!

The factor which influences the design of curves, is

Correct! Wrong!

The portion of a road surface, which is used by vehicular traffic, is known as

Correct! Wrong!

The city roads which are meant for through traffic usually on a continuous route are known as

Correct! Wrong!

The camber, for the drainage of surface water, was first introduced by

Correct! Wrong!

In order to give satisfactory service throughout the year, the road surface should

Correct! Wrong!

The foundation of a road is also called

Correct! Wrong!

The super structure of a road is called

Correct! Wrong!

The highest point on road surface is called

Correct! Wrong!

The thickness of road surfacing depends upon the

Correct! Wrong!

In the absence of super-elevation on road along curves, pot holes are likely to occur at the

Correct! Wrong!

The super-elevation is

Correct! Wrong!

The rate of rise or fall of the road surface along its length, is called

Correct! Wrong!

The value of maximum gradient for hill roads is

Correct! Wrong!

The minimum length of a valley curve should be such that the head light beam sight distance is equal to the

Correct! Wrong!

Alignment of a road is finally decided on the basis of

Correct! Wrong!

In detailed survey of a hill road, the interval for plotting the contours at sharp curves is generally

Correct! Wrong!

The minimum value of camber provided for thin bituminous surface hill roads, is

Correct! Wrong!

Traffic engineering only includes

Correct! Wrong!

Road makers along roads from the edge of a curve should not be less than

Correct! Wrong!

Traffic surveys are carried out

Correct! Wrong!

The efficiency of the brakes of a vehicle depends upon

Correct! Wrong!

Reinforcement in cement concrete slab of road pavements, is placed

Correct! Wrong!

Minimum permissible speed on high speed roads, is decided on the basis of

Correct! Wrong!

Transverse joints are provided at distances varying from

Correct! Wrong!

Enoscope is used to determine

Correct! Wrong!

The width of road pavements, depends upon

Correct! Wrong!

In case of a multi-lane road, overtaking is generally permitted

Correct! Wrong!

The number of vehicles moving in a specified direction on a roadway that pass a given point during specified unit of time, is called

Correct! Wrong!

The average number of vehicles per day passing on a section of the road during a particular year, is called

Correct! Wrong!

Weight of a vehicle affects

Correct! Wrong!

Traffic engineering deals with the

Correct! Wrong!

A complete signal-time cycle constitutes

Correct! Wrong!

Dead slow' is a

Correct! Wrong!

The traffic manoeuvre means

Correct! Wrong!

The suitable gradient within which the engineer must endeavour to design the road is called

Correct! Wrong!

The length of the side of warning sign boards of roads is

Correct! Wrong!